MVHR Commissioning

Also called: Mechanical ventilation with heat recovery · Ventilation commissioning

Full commissioning of mechanical ventilation with heat recovery systems, with the paperwork Building Control expects.

What is MVHR commissioning?

MVHR systems supply fresh air and extract stale air while recovering heat. To work as designed, they must be balanced and set up properly.

Commissioning means measuring airflow at every supply and extract terminal, adjusting it to the design rates, and recording the results.

Photo: mvhr commissioning on one of your sites

Why it matters

An unbalanced system can be noisy, inefficient and poor at removing moisture. Commissioning is also a requirement of Approved Document F, and the system settings can affect the SAP result.

What's involved

  1. 1

    We review the ventilation design and the commissioning requirements.

  2. 2

    On site we check ductwork, filters and controls, then measure and balance airflow at every terminal.

  3. 3

    We record boost, background and any other settings.

What you receive

A commissioning certificate and a full results sheet, plus the Building Regulations commissioning notice where required.

FAQs

Do you also commission MEV or other systems?

Confirm whether you commission MEV, dMEV or PIV systems.

Need a quote or have a question?

Send us your plans or tell us about your project and we'll come back with a clear quote.

Book MVHR commissioning
Call usGet a quote