Skip to content
Alpha Air Testers Ltd

Energy and compliance calculationsPart OCIBSE TM59

Part O Overheating Assessments

Also called: Overheating assessment · TM59 modelling

Overheating risk assessments for new homes, using either the simplified method or full dynamic thermal modelling to CIBSE TM59.

What is a Part O assessment?

Part O of the Building Regulations requires new residential buildings to limit solar gains and provide a way to remove excess heat. We assess your design and show how it complies.

Two routes

Simplified method

A quicker, lower-cost check based on location, glazing areas, shading and ventilation. It suits many houses and smaller schemes, but has limits, for instance where windows can't be opened because of noise or security.

Dynamic thermal modelling (CIBSE TM59)

A detailed simulation of how the building performs over a hot summer. Often needed for flats, apartment blocks, buildings with communal heating, or designs that don't pass the simplified method. It shows how changes to glazing, shading or ventilation improve the result.

What we need from you

Plans, elevations, glazing specification (including g-values, the share of solar heat a window lets through), shading details, ventilation arrangements and the building's location.

What you receive

A Part O compliance report for Building Control, with recommendations if mitigation is needed.

FAQs

Which route do I need?

Send us the drawings and we'll tell you. Many houses pass on the simplified method; flats and heavily glazed designs often need TM59.

Need a quote or have a question?

Send us your plans or tell us about your project and we'll come back with a clear quote.

Get a Part O quote
Call usGet a quote